The mechanical system of pipe processing equipment china is mainly composed of double hydraulic cylinder assembly, pipe processing equipment china main engine part, clamping assembly, bending parts and winch. pipe processing equipment china main machine part is installed with pipe bending die, turntable and pipe processing equipment china spindle and other important parts. The clamping of the pipe is achieved by clamping the oil cylinder and the clamping screw. The pipe bending part is fixed by the pipe bending spindle, and rotates with the bending die of the main machine part. The pipe bending is realized by cooperating with the bending die of the main machine part of pipe processing equipment china. So what are the safety technical requirements for use? ,

1, before work, carefully check whether the departments are normal, whether the electrical equipment is in good condition, and whether the lubrication system is smooth; Remove tools, measuring tools and other debris and corner waste placed on and around the table.

2, do not operate pipe processing equipment china alone, should be coordinated by 2-3 people to feed, control dimensional accuracy and take materials, and determine the unified command by 1 person.

3, according to the specified cutting plate thickness, adjust the scissors gap. Do not cut two different specifications, different materials of sheet material at the same time; Do not stack cutting. The surface of the cut sheet should be flat, and do not cut the narrow sheet that cannot be compressed.

4, pipe processing equipment china belt, flywheel, gear and shaft and other moving parts must be installed protective cover.

5, pipe processing equipment china The operator's feeding finger should be at least 200mm away from the scissors mouth, and away from the pressing device. The protective bars placed on the scissor trigger should not block the operator's eyes from seeing the cutting site. The waste generated after the operation is angular, and the operator should remove it in time to prevent being stabbed and cut.

6, the flywheel, gear, shaft, tape and other moving parts should be equipped with protective cover.

7. Place a fence to prevent the operator's hand from entering the scissor drop area. It is strictly forbidden to pick up waste materials on the ground when working, so as not to be hurt by falling workpieces.

8, can not cut the quenched material, and must not be allowed to cut more than the working capacity of the shearing machine.